Pebble Ridge Sewer Project Update – April 02, 2021

We installed four (4) laterals on Springdale and drilling in the easement off Old New Road is continuing.

 

A special note for the residents of Willow

Residents on Willow will not be able to hook up to the sewer until the lower part of the easement line is completed over the next few months.

 

In the next week weather and conditions permitting we will expect to install:

  • Continue installing laterals on Springdale Road
  • Continue the pre drilling on the easement of Old New Road
  • Begin installation of main on Anvil Lane
  • Sweeping and cold patching where needed

 


BCWSA Employees will be putting safety protocols for the Corona virus in place on the job site.  They will be wearing gloves, keeping distance between each other when possible & as appropriate, wiping down equipment & vehicles while in use.  Interaction with residents is to be postponed.  If a lateral location needs to be adjusted any interaction between residents and BCWSA personnel will be done with the appropriate social distancing & protection needed for safety.