We installed 154LF of pipe on the easement off Old New Road. Drilling in the easement off Old New Road is continuing. The second crew completed emergency work this week.

 

A special note for the residents of Willow

Residents on Willow will not be able to hook up to the sewer until the lower part of the easement line is completed over the next few months.

 

In the next week weather and conditions permitting we will expect to install:

  • Complete the run of the main in the easement between Old New Road and Willow Ln. to MH#68 on Willow Lane
  • Continue installing main and drill work on the upper easement between Lower State Road and Old New Road
  • Begin main installation on David’s Way
  • Sweeping and cold patching where needed

 


BCWSA Employees will be putting safety protocols for the Corona virus in place on the job site.  They will be wearing gloves, keeping distance between each other when possible & as appropriate, wiping down equipment & vehicles while in use.  Interaction with residents is to be postponed.  If a lateral location needs to be adjusted any interaction between residents and BCWSA personnel will be done with the appropriate social distancing & protection needed for safety.